logo

Martin Luther King Road Closure for New Road Configuration

One of 26 projects Taiyo tracks in Texas/New Mexico.

Source: KVIA

Project
Planned

A 50-hour closure of Martin Luther King (FM-3255) north and southbound between Stan Roberts (FM-2529) and O’Hara Road (NM-404) is scheduled to allow for a traffic switch to facilitate construction of the new road configuration. Local traffic will have access to businesses and residences between O-Hara Road and the Texas/New Mexico State Line. Detours will be in place using NM-404, I-10, Loop 375,

Status
Prospective
Sector
Road
Location
El Paso, Texas/New Mexico, United States of America
Updated
22 Jul 2026
Source
KVIA

ConstructChat

Ask ConstructChat about Martin Luther King Road Closure for New Road Configuration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Martin Luther King Road Closure for New Road Configuration” is an infrastructure initiative in the Road sector, located in El Paso, Texas/New Mexico, USA. Taiyo aggregates data on it from KVIA.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 50-hour closure of Martin Luther King (FM-3255) north and southbound between Stan Roberts (FM-2529) and O’Hara Road (NM-404) is scheduled to allow for a traffic switch to facilitate construction of the new road configuration. Local traffic will have access to businesses and residences between O-Hara Road and the Texas/New Mexico State Line. Detours will be in place using NM-404, I-10, Loop 375, and US-54.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Texas/New Mexico

City

El Paso

Source

Source

KVIA

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project