Martinsburg VA Medical Center Steam Piping Repair
Closed · West Virginia · Last reported Oct 2025
Source: Dodge
Replace Steam Piping from B320 to B500 Phase I at the VA Medical Center, Martinsburg, WV 25405 in accordance with the drawings and specifications. This procurement is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. Work includes, but is not limited to, excavation, fencing, soil preparation and reseeding of lawn for the addition of direct-buried pipe from the Boiler Plant,
- Status
- Closed
- Sector
- Raw Materials, Power Generation (CCGT), Fertilizers, Commercial, Hospital, Manufacturing (Industrial)
- Location
- Martinsburg, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Martinsburg VA Medical Center Steam Piping Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace Steam Piping from B320 to B500 Phase I at the VA Medical Center, Martinsburg, WV 25405 in accordance with the drawings and specifications. This procurement is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. Work includes, but is not limited to, excavation, fencing, soil preparation and reseeding of lawn for the addition of direct-buried pipe from the Boiler Plant, Bldg. 320, to the interior of Hospital, Bldg. 500, in the Basement Interstitial Space, electrical... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Martinsburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Fertilizers, Commercial, Hospital, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
