Maryland's First Integrated Algae-Based Biomanufacturing Facility Expansion
Sector: Water Supply and Storage • Location: Aberdeen, Maryland, USA
Source: Patch
The project involves building Maryland's first fully integrated algae-based biomanufacturing facility at Harford County's CONVERGE Center in Aberdeen. The expansion includes advanced production equipment and key facility upgrades such as patented photobioreactors for controlled algae growth, specialized downstream processing tools like pyrolysis units and dewatering systems, and upgrades to air ha
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial
- Location
- Aberdeen, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Maryland's First Integrated Algae-Based Biomanufacturing Facility Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves building Maryland's first fully integrated algae-based biomanufacturing facility at Harford County's CONVERGE Center in Aberdeen. The expansion includes advanced production equipment and key facility upgrades such as patented photobioreactors for controlled algae growth, specialized downstream processing tools like pyrolysis units and dewatering systems, and upgrades to air handling, water processing, environmental controls, and bioprocessing utilities. These improvements will transform 1,000 square feet of the CONVERGE Center into a state-of-the-art production floor for sustainable materials production. |
Original sector | Biomanufacturing |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Aberdeen |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial |
Article published date | 2025-12-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Widen Turnpike from Glades Rd to Atlantic Ave
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SAS CU UPW/IWT Project
- Delta Conveyance Project
- California High-Speed Rail Systemwide Sustainability Program
- Stromberg Development Tract Mixed-Use Project
- Storm Drain Trash Capture Installation on Holmes Street
- Sonoran Sparkle Diamond Mine Project
