Masirah Grid Connection Project
Sector: Power Generation (CCGT) • Location: Oman
Source: Trade Arabia
The Masirah Grid Connection Project aims to enhance the efficiency of electricity transmission in Oman by constructing a 132/33 kV grid station, a 132 kV subsea cable, and an underground cable, addressing the increasing energy demand and improving public services.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Oman
- Updated
- 22 Jul 2026
- Source
- Trade Arabia
ConstructChat
Ask ConstructChat about Masirah Grid Connection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Masirah Grid Connection Project aims to enhance the efficiency of electricity transmission in Oman by constructing a 132/33 kV grid station, a 132 kV subsea cable, and an underground cable, addressing the increasing energy demand and improving public services. |
Original sector | Energy |
Budget |
Location
Country | Oman |
Source
Source | Trade Arabia |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Oman
- Ibri Independent Power Project
- Salalah Liquefied Petroleum Gas Project, Dhofar
- Qalhat LNG Plant (Liquid Natural Gas Project), Oman
- Bawsher to Seeb Water Transmission Project, Oman
- Al Batinah Expressway, Oman
- Musandam Independent Power Project IPP
- Miraah Solar Thermal Project
- Sohar Refinery, Wilayat of Sohar
