Masonry repair (Phase 4)
Sector: Water Supply and Storage • Location: Quebec, Canada
Source: Infrastructure Canada
The project aims to repair the joints of the stone masonry of the central Pavilion (Wing C) of the Cégep de Victoriaville. The work consists of waterproofing the building envelope to prevent water infiltration and preserve the integrity of the building. The project will support pandemic response and economic recovery, notably by maintaining and upgrading the quality of school infrastructure.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Commercial
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Masonry repair (Phase 4)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to repair the joints of the stone masonry of the central Pavilion (Wing C) of the Cégep de Victoriaville. The work consists of waterproofing the building envelope to prevent water infiltration and preserve the integrity of the building. The project will support pandemic response and economic recovery, notably by maintaining and upgrading the quality of school infrastructure. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Commercial |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
