logo
ProjectClosed

Mass Ave Partial Construction Phase 1

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Removal of roadway median island including saw cutting existing asphalt pavement, removing and resetting island end curbing, removing concrete median fill, removing and resetting median signage, filling and final paving of median removal area, pavement striping, and flex post installation. 2. Utility work including water main temporary bypass and replacement, water service replacements, hydrant re

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Road, Government, Cement, Power Generation (CCGT), Car parking, Automotive
Location
Cambridge, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mass Ave Partial Construction Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mass Ave Partial Construction Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambridge, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removal of roadway median island including saw cutting existing asphalt pavement, removing and resetting island end curbing, removing concrete median fill, removing and resetting median signage, filling and final paving of median removal area, pavement striping, and flex post installation. 2. Utility work including water main temporary bypass and replacement, water service replacements, hydrant replacements, sewer main cured in place pipelining installation of new sewer manholes, stormwater c...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Cambridge

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Road, Government, Cement, Power Generation (CCGT), Car parking, Automotive

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project