logo

Massachusetts Data Center Expansion

Sector: Power Generation (CCGT) • Location: Massachusetts, United States

Source: The Boston Globe

Project
Planned

Massachusetts is preparing for a significant increase in data center construction, with requests for an additional 2 gigawatts of electricity from proposed data centers. This expansion includes a multibillion-dollar data center project in Western Massachusetts, expected to cost over $3 billion at full buildout, generating substantial property tax revenue and jobs. The state aims to power these cen

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Location
Massachusetts, United States of America
Updated
22 Jul 2026
Source
The Boston Globe

ConstructChat

Ask ConstructChat about Massachusetts Data Center Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Massachusetts Data Center Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Massachusetts, United States. Taiyo aggregates data on it from The Boston Globe.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Massachusetts is preparing for a significant increase in data center construction, with requests for an additional 2 gigawatts of electricity from proposed data centers. This expansion includes a multibillion-dollar data center project in Western Massachusetts, expected to cost over $3 billion at full buildout, generating substantial property tax revenue and jobs. The state aims to power these centers with clean energy while managing the impact on electricity rates and the power grid.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Massachusetts

Source

Source

The Boston Globe

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2025-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project