Massachusetts V2X Pilot Program
Planned · Massachusetts · Last reported Mar 2025
Source: EV World
A two-year initiative aimed at deploying 100 bidirectional chargers across the state to enable electric vehicles (EVs) to serve as mobile energy storage units. This program will collectively provide an estimated 1.5 MW of new storage capacity, allowing EVs to not only receive power but also return it to the grid, supporting renewable energy use.
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Energy Storage
- Location
- Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- EV World
ConstructChat
Ask ConstructChat about Massachusetts V2X Pilot Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A two-year initiative aimed at deploying 100 bidirectional chargers across the state to enable electric vehicles (EVs) to serve as mobile energy storage units. This program will collectively provide an estimated 1.5 MW of new storage capacity, allowing EVs to not only receive power but also return it to the grid, supporting renewable energy use. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Massachusetts |
Source
Source | EV World |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Energy Storage |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States
- New Orleans BioInnovation Center
- MSU Grand Rapids Research Centre, Michigan, USA
- Silver Line Gateway Project, Massachusetts
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Upsher-Smiths’ Pharmaceutical Manufacturing Facility, Minnesota, USA
- Annual Meeting of Stockholders
- HVIP Deadline Approaching: Don’t Miss Out on Incentives for Your Zero-Emission Fleet Before 2025
- Xos DC Fast Chargers
