MassDOT: Bourne Bridge Replacement
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
Phase Two of the Cape Cod Canal Bridges Program. To be initiated after the Sagamore bridge which is Phase One. The Bourne and Sagamore bridges across the Cape Cod Canal are the only roadway access to the Cape Cod peninsular from mainland Massachusetts. The existing bridge will be demolished after the new construction
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Commercial
- Location
- Bourne, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MassDOT: Bourne Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase Two of the Cape Cod Canal Bridges Program. To be initiated after the Sagamore bridge which is Phase One. The Bourne and Sagamore bridges across the Cape Cod Canal are the only roadway access to the Cape Cod peninsular from mainland Massachusetts. The existing bridge will be demolished after the new construction |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Bourne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
