Master Paving Program
Sector: Road • Location: Memphis, Tennessee, United States of America
Source: Dodge USA
The project scope is to provide all labor, technical skills, tools, materials, and equipment necessaryfor the milling and paving repairs, paving of approximately 4,100 excavation patches, and 50 milesof single-lane paving. The Contractor is responsible for set up, operation and take down of allequipment used during the execution of Work in strict accordance as outlined in the Contract Documents an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project scope is to provide all labor, technical skills, tools, materials, and equipment necessaryfor the milling and paving repairs, paving of approximately 4,100 excavation patches, and 50 milesof single-lane paving. The Contractor is responsible for set up, operation and take down of allequipment used during the execution of Work in strict accordance as outlined in the Contract Documents and Specifications. The Contract is separated into three sections: 1. Excavation Patches 2. Single ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
