Master Pump Station 302 Force Main Replacement
Sector: Water Supply and Storage • Location: Naples, Florida, United States of America
Source: Dodge USA
Installation of a new 36" force main that will tie into the existing 36 force main that leaves the Master Pump Station (MPS) 302. This project intends to abandon a portion of the existing 36 force main that is currently installed under the intersection of Santa Barbara Boulevard with Rattlesnake Hammock Road and reaching the end of its service life. A new 36 force main will replace the abandoned s
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Naples, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Master Pump Station 302 Force Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of a new 36" force main that will tie into the existing 36 force main that leaves the Master Pump Station (MPS) 302. This project intends to abandon a portion of the existing 36 force main that is currently installed under the intersection of Santa Barbara Boulevard with Rattlesnake Hammock Road and reaching the end of its service life. A new 36 force main will replace the abandoned section of the pipe. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Naples |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
