logo

MasterWind Sindh Wind Farm

Sector: Wind • Location: Pakistan

Source: World Bank Group

Project
Active

Master Wind Energy Pvt. Ltd. reached financial closure on a 50MW Wind Farm, Jhampir, Sindh Province. The project cost is $133 million, of which $100 million is debt financed.

The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. Land for the project was awarded by the government of Pakistan. The O&M of the Project will

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MasterWind Sindh Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MasterWind Sindh Wind Farm” is an infrastructure initiative in the Wind sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Master Wind Energy Pvt. Ltd. reached financial closure on a 50MW Wind Farm, Jhampir, Sindh Province. The project cost is $133 million, of which $100 million is debt financed. The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. Land for the project was awarded by the government of Pakistan. The O&M of the Project will be performed by the EPC Contractor (PowerChina) during the first two years following Commercial Operations Date on a turnkey basis. There after, General Electric will directly under take the O&M of the Project from year 3 to 10 (following commercial operations date). The project is being developed under the Upfront Tariff Regime announced by the Government in 2013. The Feed in Tariff (along with permitted indexations and escalations) will be applicable through out the concession period of 20 years from achievement of commercial operations. The concession shall be backed by sovereign guarantees that are given by the GOP under the Concession Agreements namely the Energy Purchase Agreement and the Implementation Agreement. For MWEL, with 50% local and 50% foreign financing, electricity will be supplied to the grid at a levelized rate of 14.74 Rs/kwh. Details of the tariff are summarized below: No further information was available. https://www.opic.gov/sites/default/files/files/MWEL-public-info-summary-fy14.pdf Source: Renewable Energy Report: Pakistan Agency Issues Proposal to Create Feed-in Tariff for Wind Energy Production (31 October 2011)

Original sector

Energy

Procurement method

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project