logo
ProjectBid Results

MAT Carrizo Water System Impro Pkg 1

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The Project includes the following Work: 1.Bid Lot 1 Project AL-22-C37: Replacement of the existing Upper Pena booster station valve and vault with prefabricated booster station building, booster pump system, SCADA, electrical and controls 2.Bid Lot 2 Project AL-22-C55: Abandonment of two groundwater wells, demolition and removal of two abandoned water storage tanks 3.Bid Lot 3 Project AL-22-C46:

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment
Location
Mescalero, New Mexico, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MAT Carrizo Water System Impro Pkg 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MAT Carrizo Water System Impro Pkg 1” is an infrastructure initiative in the Commercial sector, located in Mescalero, New Mexico, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: 1.Bid Lot 1 Project AL-22-C37: Replacement of the existing Upper Pena booster station valve and vault with prefabricated booster station building, booster pump system, SCADA, electrical and controls 2.Bid Lot 2 Project AL-22-C55: Abandonment of two groundwater wells, demolition and removal of two abandoned water storage tanks 3.Bid Lot 3 Project AL-22-C46: Replacement of the existing State Well Pumphouse and improvements to the existing State Well 1, r...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Mexico

City

Mescalero

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project