Matadero & Barron Creek Gas Main Replacement
Sector: Chemical (Industrial) • Location: Palo Alto, California, United States of America
Source: Dodge
The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of
- Status
- Prospective
- Sector
- Chemical (Industrial), Oil and Gas, Road, Natural Gas, Manufacturing (Industrial), Commercial, Government
- Location
- Palo Alto, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Matadero & Barron Creek Gas Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of natural gas service pipelines. This project was selected and awarded with a federal grant by the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Palo Alto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Oil and Gas, Road, Natural Gas, Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
