Matarbari Power Plant Tariff Adjustment
Sector: Power Generation (CCGT) • Location: Matarbari, Cox's Bazar, Bangladesh
Source: The Business Standard
The Bangladesh Power Development Board has finalized a new tariff for the Matarbari Ultra Super Critical Coal-Fired Power Plant, setting the per-unit electricity cost at Tk8.45, which is significantly lower than other coal-based plants. This adjustment aims to serve as a benchmark for renegotiating tariffs with other power plants in the region.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Matarbari, Cox's Bazar, Bangladesh
- Updated
- 22 Jul 2026
- Source
- The Business Standard
ConstructChat
Ask ConstructChat about Matarbari Power Plant Tariff Adjustment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bangladesh Power Development Board has finalized a new tariff for the Matarbari Ultra Super Critical Coal-Fired Power Plant, setting the per-unit electricity cost at Tk8.45, which is significantly lower than other coal-based plants. This adjustment aims to serve as a benchmark for renegotiating tariffs with other power plants in the region. |
Original sector | Energy |
Location
Country | Bangladesh |
State | Cox's Bazar |
City | Matarbari |
Source
Source | The Business Standard |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
