Matawinie Graphite Project Phase-2
Sector: Energy Storage • Location: Quebec, Canada
Source: Finimize
Nouveau Monde Graphite is advancing its phase-2 Matawinie graphite project in Quebec, aiming to become a top North American supplier of battery-grade graphite. The project includes the Matawinie mine and the Becancour battery material plant, with pilot production and engineering underway. The latest feasibility study shows a post-tax net present value of $238 million, a 15.8% internal rate of retu
- Status
- Under Construction
- Sector
- Energy Storage, Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Finimize
ConstructChat
Ask ConstructChat about Matawinie Graphite Project Phase-2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nouveau Monde Graphite is advancing its phase-2 Matawinie graphite project in Quebec, aiming to become a top North American supplier of battery-grade graphite. The project includes the Matawinie mine and the Becancour battery material plant, with pilot production and engineering underway. The latest feasibility study shows a post-tax net present value of $238 million, a 15.8% internal rate of return, and a payback period of just over five years. |
Original sector | Mining |
Budget |
Location
Country | Canada |
State | Quebec |
Source
Source | Finimize |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Government |
Article published date | 2025-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
