Materials Recovery Facility Retrofit
Sector: Water Supply and Storage • Location: Charlotte, North Carolina, United States of America
Source: Dodge USA
This project consists of various infrastructure improvements to the Materials Recovery Facility (MRF) building (approximately 94,000 sq. feet) in support of the installation of new recycling processing equipment. The work will include, but is not limited to, a new janitor s closet with relocated water heater, a new vestibule and door from the processing area, modified equipment floor pits and modi
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Government
- Location
- Charlotte, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Materials Recovery Facility Retrofit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of various infrastructure improvements to the Materials Recovery Facility (MRF) building (approximately 94,000 sq. feet) in support of the installation of new recycling processing equipment. The work will include, but is not limited to, a new janitor s closet with relocated water heater, a new vestibule and door from the processing area, modified equipment floor pits and modified structural bays. The existing electrical, fire alarm and fire protection systems will be mod... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Charlotte |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
