logo
ProjectAwarded

Mathis Ferry Road Phase 2 Pedestrian Project

Sector: Cement • Location: Mount Pleasant, South Carolina, United States

Source: Live 5 News

Phase 2 of the Mathis Ferry Road project involves safety improvements for pedestrians and cyclists, including a 10 to 12 foot width concrete path, improved pedestrian ramps, and drainage adjustments. The project runs from Eagle Street to US 17 in Mount Pleasant and is part of the town-wide shared-use path project called Mount Pleasant Way. The design process has started with an on-call design cons

Status
Closed
Sector
Cement, Road, Waste Processing and Treatment, Government
Location
Mount Pleasant, South Carolina, United States of America
Updated
22 Jul 2026
Source
Live 5 News

ConstructChat

Ask ConstructChat about Mathis Ferry Road Phase 2 Pedestrian Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mathis Ferry Road Phase 2 Pedestrian Project” is an infrastructure initiative in the Cement sector, located in Mount Pleasant, South Carolina, United States. Taiyo aggregates data on it from Live 5 News.

Participants

Sponsoring Agency

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 2 of the Mathis Ferry Road project involves safety improvements for pedestrians and cyclists, including a 10 to 12 foot width concrete path, improved pedestrian ramps, and drainage adjustments. The project runs from Eagle Street to US 17 in Mount Pleasant and is part of the town-wide shared-use path project called Mount Pleasant Way. The design process has started with an on-call design consultant, and construction is anticipated to begin after 18 to 24 months of design work. The project is funded by a federal grant from the SCDOT Safe Streets and Roads for All program.

Original sector

Built Environment

Location

Country

United States of America (USA)

State

South Carolina

City

Mount Pleasant

Source

Source

Live 5 News

URL

More Details

Record type

Project

Sector

Cement, Road, Waste Processing and Treatment, Government

Article published date

2025-12-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project