logo

Matiari-Lahore Transmission Line

Sector: Power Transmission • Location: Pakistan

Source: World Bank Group

Project
Active

The project involves the 878 km High Voltage Direct Current (HVDC) Matiari-Lahore transmission line. The capacity is 4000 MW at ±660 kV voltage. The project will have bi-pole HVDC technology, 2 converter stations, one each at Matiari and Lahore, 3 repeater stations and 2 grounding electrode stations. The facility will be used to transmit power generated from Thar coal-based projects and is part of

Project Information FAQ

Project Information

4 Q
The project “Matiari-Lahore Transmission Line” is an infrastructure initiative in the Power Transmission sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the 878 km High Voltage Direct Current (HVDC) Matiari-Lahore transmission line. The capacity is 4000 MW at ±660 kV voltage. The project will have bi-pole HVDC technology, 2 converter stations, one each at Matiari and Lahore, 3 repeater stations and 2 grounding electrode stations. The facility will be used to transmit power generated from Thar coal-based projects and is part of the China-Pakistan Economic Corridor (CPEC)’s portfolio. The project is under Build-Operate-Transfer model and will be transferred to National Transmission & Despatch Company (NTDC) after 25 years, with commercial operations starting in March 2021. The tariff is fixed at 0.7435 Rs./kW/h. The SPV is Pak Matiari-Lahore Transmission Company Ltd (PMLTC) and the sponsor is the China Electric Power Equipment and Technology, a subsidiary of State Grid Corporation of China (SGCC). The project is worth $ 1.658 billion. Debt:equity ratio is 80:20. China Development Bank will offer no more than $ 1.3 billion. CITIC Insurance will provide overseas insurance covering the equity and creditor’s rights for the project. Financial close was announced on 28 February 2019. Info re China Development Bank sourced from King & Wood Malleson http://www.cpecinfo.com/news/matiari-lahore-transmission-line-under-cpec-achieves-financial-close/NjcyNQ== http://cpec.gov.pk/project-details/17 http://www.ppib.gov.pk/tl_fc.htm https://www.beltroad-initiative.com/matiari-lahore-transmission-line-project/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data