MATUCANA POWER
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project consists of the 120 MW Matucana hydroelectric power station on the Rio Rimac, a 220 KV double circuit steel tower transmission line about 80 km long from the power station to Lima and associated substations, and meters, communications equipment, distribution cables and other items for the expansion of the distribution system.
- Status
- Closed
- Sector
- Power Generation (CCGT), Steel, Metal, Government, Hydro
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MATUCANA POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the 120 MW Matucana hydroelectric power station on the Rio Rimac, a 220 KV double circuit steel tower transmission line about 80 km long from the power station to Lima and associated substations, and meters, communications equipment, distribution cables and other items for the expansion of the distribution system. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Steel, Metal, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project