Mauritania - Nouakchott City "Aftout Essahli" Drinking Water Supply Project

Sector: Manufacturing (Industrial) • Location: Mauritania

Source: African Development Bank (AfDB)

Project

This project is related to the 2nd tranche of funding for the additional donation of the Nouakchott city “aftout essaheli” drinking water supply project. This project was conceived in order to remedy the problem of water scarcity which suffers the city of Nouakchott and its surroundings and which handicaps the development of the industrial and commercial activities affecting the life and health st

Project Information FAQ

Project Information

4 Q
The project “Mauritania - Nouakchott City "Aftout Essahli" Drinking Water Supply Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Mauritania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is related to the 2nd tranche of funding for the additional donation of the Nouakchott city “aftout essaheli” drinking water supply project. This project was conceived in order to remedy the problem of water scarcity which suffers the city of Nouakchott and its surroundings and which handicaps the development of the industrial and commercial activities affecting the life and health status of the people. The needs of the latter in water are constantly increasing. They are estimated at more than 100,000 m³/d in 2010, 170,000 m³/d in 2020 and 226,000 m³/d in 2030. These needs can no longer be covered by the production of the only available aquifer of Trarza estimated at 55,000 m³ / day. The Aftout Essahli project is the overall solution for the supply of drinking water to the Mauritanian capital, Nouakchott, from the Senegal River located nearly 200 km to the south. It involves the execution of three pumping stations with a flow rate of 170,000 m³/d, 160,000 m³/d and 150,000 m³/d, including design, realization, testing, commissioning , semi-industrial walking as well as staff training. Indeed, its dimensioning was realized to produce 170,000 cubic meters per day allowing the satisfaction of the demand by 2020. Provisions are planned to bring this production to 226.000 cubic meters in order to satisfy the demand of the populations of the city until 2030. The project is divided into five lots. The first one concerned pretreatment and treatment works; a second, pumping stations and associated power lines; a third, the pre-treated water supply of Nouakchott; a fourth, by far the most important, dealing with water transfer pipes from pumping stations along the Senegal River to pre-treatment and treatment plants; and the last, the connecting pipe of the processing plant located at PK 17 to the distribution network of the city of Nouakchott.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High