Mauritania - Rural Hydraulics Project in South-Eastern Mauritania
One of 1,223 projects Taiyo tracks in Mauritania.
Source: African Development Bank (AfDB)
The Rural Hydraulics Project in South-Eastern Mauritania represents the village component of the Mauritanian aspect of the second village and pastoral hydraulic CEAO programme. It relates to the Bank Group's continued support to the drinking water supply sector and more particularly to the rural water sub-sector. The project should make available to a population suffering from a significant water
- Sector
- Water Supply and Storage, Government
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Mauritania - Rural Hydraulics Project in South-Eastern Mauritania
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rural Hydraulics Project in South-Eastern Mauritania represents the village component of the Mauritanian aspect of the second village and pastoral hydraulic CEAO programme. It relates to the Bank Group's continued support to the drinking water supply sector and more particularly to the rural water sub-sector. The project should make available to a population suffering from a significant water shortage, about 1.4 million cubic metres of drinking water per year through 220 new water points, making it possible to meet the needs of nearly 218,000 people. From a socio-economic point of view, the major impacts of the project should be reflected in the improvement of the general health status of the beneficiaries, the establishment of populations near the newly created water points, and on the development (around certain boreholes with sufficient flow) of small irrigated areas. The main components of the project are: (A) studies on the location of boreholes, control and supervision of works; (B) execution of drilling works; (C) supply and installation of hand pumps; (D) construction and equipment of motorized pumping stations; and (E) institutional support. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Mauritania |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
