logo
Project

Mauritania - Rural Hydraulics Project in South-Eastern Mauritania

One of 1,223 projects Taiyo tracks in Mauritania.

Source: African Development Bank (AfDB)

The Rural Hydraulics Project in South-Eastern Mauritania represents the village component of the Mauritanian aspect of the second village and pastoral hydraulic CEAO programme. It relates to the Bank Group's continued support to the drinking water supply sector and more particularly to the rural water sub-sector. The project should make available to a population suffering from a significant water

Sector
Water Supply and Storage, Government
Location
Mauritania
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Mauritania - Rural Hydraulics Project in South-Eastern Mauritania

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mauritania - Rural Hydraulics Project in South-Eastern Mauritania” is an infrastructure initiative in the Water Supply and Storage sector, located in Mauritania. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rural Hydraulics Project in South-Eastern Mauritania represents the village component of the Mauritanian aspect of the second village and pastoral hydraulic CEAO programme. It relates to the Bank Group's continued support to the drinking water supply sector and more particularly to the rural water sub-sector. The project should make available to a population suffering from a significant water shortage, about 1.4 million cubic metres of drinking water per year through 220 new water points, making it possible to meet the needs of nearly 218,000 people. From a socio-economic point of view, the major impacts of the project should be reflected in the improvement of the general health status of the beneficiaries, the establishment of populations near the newly created water points, and on the development (around certain boreholes with sufficient flow) of small irrigated areas. The main components of the project are: (A) studies on the location of boreholes, control and supervision of works; (B) execution of drilling works; (C) supply and installation of hand pumps; (D) construction and equipment of motorized pumping stations; and (E) institutional support.

Original sector

Water Supply & Sanitation

Budget

Location

Country

Mauritania

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project