logo

Mauritania - West Brakna Irrigation Scheme Project

Sector: Raw Materials • Location: Mauritania

Source: African Development Bank (AfDB)

Project

The project concerns the West Brakna area located on the right bank of River Senegal, downstream from Boghé. In fact, confronted with random and insufficient productions due to climatic hazards and drought, the Brakna West zone constitutes an area of extreme poverty. The project is in line with the integrated irrigated agricultural development programme aimed at revitalizing farming activities in

Project Information FAQ

Project Information

4 Q
The project “Mauritania - West Brakna Irrigation Scheme Project” is an infrastructure initiative in the Raw Materials sector, located in Mauritania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project concerns the West Brakna area located on the right bank of River Senegal, downstream from Boghé. In fact, confronted with random and insufficient productions due to climatic hazards and drought, the Brakna West zone constitutes an area of extreme poverty. The project is in line with the integrated irrigated agricultural development programme aimed at revitalizing farming activities in the River Senegal valley. It aims at the rehabilitation of 3,400 ha of basins suitable for flood recession crop cultivation with the cleansing of the water supply channels. Some forty vegetable growing blocks tended by women and totaling 110 ha. will be rehabilitated. The envisaged support to land development will translate into measures to guarantee quality production and ensure optimal management of production systems. To this end, the project will build the capacities of farmer organizations and provide agricultural advisory services in the area of crop production and farm management. The main components are as follows: (A) Irrigation schemes, (B) Development, and (C) Project Management. The five-year project will be executed for a total, excluding taxes and customs duties, estimated at UA 5.06 billion, or UA 12.83 million. This package will lead to a substantial increase in agricultural production and contribute to poverty alleviation as well as improve food security.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data