logo
Project

Mauritania - West Brakna Irrigation Scheme Project

One of 1,223 projects Taiyo tracks in Mauritania.

Source: African Development Bank (AfDB)

The project concerns the West Brakna area located on the right bank of River Senegal, downstream from Boghé. In fact, confronted with random and insufficient productions due to climatic hazards and drought, the Brakna West zone constitutes an area of extreme poverty. The project is in line with the integrated irrigated agricultural development programme aimed at revitalizing farming activities in

Sector
Raw Materials, Water Supply and Storage, Fertilizers, Consumer Products, Government
Location
Mauritania
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Mauritania - West Brakna Irrigation Scheme Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mauritania - West Brakna Irrigation Scheme Project” is an infrastructure initiative in the Raw Materials sector, located in Mauritania. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project concerns the West Brakna area located on the right bank of River Senegal, downstream from Boghé. In fact, confronted with random and insufficient productions due to climatic hazards and drought, the Brakna West zone constitutes an area of extreme poverty. The project is in line with the integrated irrigated agricultural development programme aimed at revitalizing farming activities in the River Senegal valley. It aims at the rehabilitation of 3,400 ha of basins suitable for flood recession crop cultivation with the cleansing of the water supply channels. Some forty vegetable growing blocks tended by women and totaling 110 ha. will be rehabilitated. The envisaged support to land development will translate into measures to guarantee quality production and ensure optimal management of production systems. To this end, the project will build the capacities of farmer organizations and provide agricultural advisory services in the area of crop production and farm management. The main components are as follows: (A) Irrigation schemes, (B) Development, and (C) Project Management. The five-year project will be executed for a total, excluding taxes and customs duties, estimated at UA 5.06 billion, or UA 12.83 million. This package will lead to a substantial increase in agricultural production and contribute to poverty alleviation as well as improve food security.

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Mauritania

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Fertilizers, Consumer Products, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project