Mauriti Solar Power Plant 3, 4 and 10 (147.33MW)
Sector: Solar • Location: Brazil
Source: World Bank Group
"This project entails the construction of the Mauriti 3, 4, and 10 Solar Power Plants, located in the municipality of Mauriti, Ceará state, Brazil. These three facilities are part of the Mauriti Solar Complex and are sponsored by the Chinese renewable energy developer PowerChina. The combined generation capacity of the Mauriti 3, 4, and 10 plants is planned to be 147.33 MW, with sufficient energy
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "This project entails the construction of the Mauriti 3, 4, and 10 Solar Power Plants, located in the municipality of Mauriti, Ceará state, Brazil. These three facilities are part of the Mauriti Solar Complex and are sponsored by the Chinese renewable energy developer PowerChina. The combined generation capacity of the Mauriti 3, 4, and 10 plants is planned to be 147.33 MW, with sufficient energy output to power over 193,000 homes. The project also includes building a transmission system comprising a collector substation and a 15-kilometer transmission line. In addition, the Mauriti Complex features six other plants not directly supported by this operation but which will share the same transmission infrastructure, connecting the complex to the National Interconnected System (SIN). The total project cost is $129 million (R$722 million), with $60 million (R$339 million) financed through a loan from the Brazilian Development Bank (BNDES) and the remaining $69 million provided by the sponsor company. Financial closure for the project was achieved on August 30, 2024." https://agenciadenoticias.bndes.gov.br/detalhe/noticia/BNDES-apoia-com-R$-339-milhoes-projeto-solar-no-Ceara/ |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
