Mauritius - Gas Insulated Switchgear Project

Sector: Power Generation (CCGT) • Location: Mauritius

Source: African Development Bank (AfDB)

Mauritius Gas Insulated Switchgear (GIS) Substation Project aims to undertake the necessary network expansion investments. This project is expected to address the vulnerability of the electricity grid to the effects of climate change and the lack of interconnection points for the absorption of renewable energy. These investments will improve the reliability of the national grid and allow for the i

Sector
Power Generation (CCGT), Solar, Government
Location
Mauritius
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Mauritius - Gas Insulated Switchgear Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mauritius - Gas Insulated Switchgear Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mauritius. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mauritius Gas Insulated Switchgear (GIS) Substation Project aims to undertake the necessary network expansion investments. This project is expected to address the vulnerability of the electricity grid to the effects of climate change and the lack of interconnection points for the absorption of renewable energy. These investments will improve the reliability of the national grid and allow for the installation, interconnection and absorption into the national grid of the additional renewable energy generation facilities envisaged. Approximately 133 MW of additional solar PV is planned in the short term to be connected to the new and rehabilitated GIS substations. The Project includes the rehabilitation of six (6) existing outdoor AIS substations with indoor GIS technology and the construction of four (4) new indoor GIS substations to meet the load demand of the major committed developments.

Original sector

Energy

Budget

Location

Country

Mauritius

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project