Mauritius Gas Insulated Switchgear (GIS) Substation Project aims to undertake the necessary network expansion investments. This project is expected to address the vulnerability of the electricity grid to the effects of climate change and the lack of interconnection points for the absorption of renewable energy. These investments will improve the reliability of the national grid and allow for the i

Project Information FAQ

Project Information

4 Q
The project “Mauritius - Gas Insulated Switchgear Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mauritius. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Mauritius Gas Insulated Switchgear (GIS) Substation Project aims to undertake the necessary network expansion investments. This project is expected to address the vulnerability of the electricity grid to the effects of climate change and the lack of interconnection points for the absorption of renewable energy. These investments will improve the reliability of the national grid and allow for the installation, interconnection and absorption into the national grid of the additional renewable energy generation facilities envisaged. Approximately 133 MW of additional solar PV is planned in the short term to be connected to the new and rehabilitated GIS substations. The Project includes the rehabilitation of six (6) existing outdoor AIS substations with indoor GIS technology and the construction of four (4) new indoor GIS substations to meet the load demand of the major committed developments.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data