Mauritius - Infrastructure Project
One of 748 projects Taiyo tracks in Mauritius.
Source: World Bank Group
The objective of the Infrastructure Project for Mauritius is to assist the Borrower to improve the national infrastructure, with an emphasis on the transport, energy and water sectors. There are two components to the project. The first component of the project is road investments: priority is given to roads whose capacity have been or will soon be exceeded, which constitute main links to key econo
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Mauritius
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mauritius - Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Infrastructure Project for Mauritius is to assist the Borrower to improve the national infrastructure, with an emphasis on the transport, energy and water sectors. There are two components to the project. The first component of the project is road investments: priority is given to roads whose capacity have been or will soon be exceeded, which constitute main links to key economic areas of the island or which connect or pass through major villages and which constitute safety hazards. There are three sub-components to this component. The first sub-component is upgrading of Belle Rive - Quartier militaire road will be financed by the Borrower; Government funding will be used to acquire the land needed for the widening of the road right-of-way. The second sub-component is periodic maintenance for three highway sections, which have not been treated since their construction in the late 1970s and the pavement of which presents clear signs of fatigue: (i) Terre Rouge - Quay D on M2, (ii) Nouvelle France - La Vigie on M1, and (iii) parts of Pamplemousses-Grand Baie on A13. The third sub-component is performance-based routine maintenance contracts: the objective of this sub-component is to determine whether performance-based contracts, once adapted to the local context, are the right means to overcome a backlog of deferred maintenance on key sections of Mauritius primary network. The second component of the project is technical assistance (TA) and institutional development in the transport - water/wastewater - energy sub-sectors: the TA components aim at laying the groundwork for possible future Sector Investment Loan (SIL) in the three sectors in approximately two years after this project becomes effective, within the framework of a public sector investment plan to be developed through the proposed loan. |
Original sector | FY17 - Energy and Extractives,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Mauritius |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mauritius
- Mauritius Metro Express
- Mauritius Light Rail Transit System
- Grand River North-West Bridge (Ntf) (P)
- Countermeasure Works for Slope Failure at Souillac Bridge
- St Julien ByPass
- Upgrading of Constance Bridge along B117 Road at St Remi Road
- CONSTRUCTION OF A FLYOVER AT PALMERSTONE VACOAS
- Realignment and widening at Salazie along B96
