Mauritius - Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour
Sector: Water Supply and Storage • Location: Mauritius
Source: African Development Bank (AfDB)
The present project involves the Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour. Construction of the Island Terminal and the breakwater is essential to create a tranquil basin and to accommodate future container traffic at Port Louis, which shall be a major hub in the region for petroleum products, cruise, container transshipment and port r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present project involves the Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour. Construction of the Island Terminal and the breakwater is essential to create a tranquil basin and to accommodate future container traffic at Port Louis, which shall be a major hub in the region for petroleum products, cruise, container transshipment and port related services, according to the Ocean Economy Initiative launched by the GOM. This study, being the first study for the project, is to demonstrate the technical and economic viability of the project, and enable the GOM to be prepared to go ahead the technically challenging project involving the 60 ha offshore reclamation, construction of a breakwater, and substantial dredging. Financing the study from the MIC TA Fund and the Bank’s advice to the MPA through the implementation of the study will facilitate the GOM to proceed with this centerpiece project, minimizing its potential environmental and social impact. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
