logo

Mauritius - Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour

Sector: Water Supply and Storage • Location: Mauritius

Source: African Development Bank (AfDB)

Project

The present project involves the Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour. Construction of the Island Terminal and the breakwater is essential to create a tranquil basin and to accommodate future container traffic at Port Louis, which shall be a major hub in the region for petroleum products, cruise, container transshipment and port r

Project Information FAQ

Project Information

4 Q
The project “Mauritius - Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour” is an infrastructure initiative in the Water Supply and Storage sector, located in Mauritius. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project involves the Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour. Construction of the Island Terminal and the breakwater is essential to create a tranquil basin and to accommodate future container traffic at Port Louis, which shall be a major hub in the region for petroleum products, cruise, container transshipment and port related services, according to the Ocean Economy Initiative launched by the GOM. This study, being the first study for the project, is to demonstrate the technical and economic viability of the project, and enable the GOM to be prepared to go ahead the technically challenging project involving the 60 ha offshore reclamation, construction of a breakwater, and substantial dredging. Financing the study from the MIC TA Fund and the Bank’s advice to the MPA through the implementation of the study will facilitate the GOM to proceed with this centerpiece project, minimizing its potential environmental and social impact.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data