Mauritius - Saint Louis Power Plant Redevelopment Project
Sector: Oil and Gas • Location: Mauritius
Source: African Development Bank (AfDB)
The Saint Louis Power Plant Redevelopment Project will be designed such that it will enable renewable sources of energy to deliver more power to the CEB grid without destabilising electricity supply, and, therefore, will be in agreement with the goal of the MID and the renewable energy objective of the LTES. The project will provide four medium speed, four stroke, heavy fuel oil (HFO) driven gener
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Saint Louis Power Plant Redevelopment Project will be designed such that it will enable renewable sources of energy to deliver more power to the CEB grid without destabilising electricity supply, and, therefore, will be in agreement with the goal of the MID and the renewable energy objective of the LTES. The project will provide four medium speed, four stroke, heavy fuel oil (HFO) driven generators with a capacity of 15 MW each; a power station building; two 1000 cubic metre tanks for the storage of HFO; and one 132 Kv substation for connection of the power plant to the existing electricity grid belonging to the Central Electricity Board (CEB), the State owned electricity utility in Mauritius. The Saint Louis Power Station is located five kilometres south of the centre of Port Louis, the capital city situated on the North West of the island. The electricity produced by the project installations will be distributed to all corners of the main island of Mauritius on the integrated transmission and distribution network connected to the power stations of the CEB. As a result, by end of 2015, the total gap in power supply will be 36 MW, against 60 MW capacity of the project. By decreasing the dependence of the country on imported fossil fuels, the project will also be in line with one of the roles assigned by the LTES to the CEB, which is to ensure security of supply. The project cost is estimated at UA 84.6 million (USD 129.70 million). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Oil and Gas projects in Mauritius
- CTDS Biomass Plant Coal CHP Plant Mauritius
- SUGAR INDUSTRY REFORM PROJECT
- Mauritius - Preliminary Technical Study and Design of Island Terminal and Breakwater Structure at Port Louis Harbour
- India-Mauritius $680 Million Economic Assistance Package
- India-Mauritius Energy Supply Agreement
- India-Mauritius Community Development Projects Phase II
- India-Mauritius Oil and Gas Supply Agreement
- India-Mauritius Oil and Gas Supply Agreement
