logo
ProjectPlanned

Maverick Project Natural Gas Power Solution

The owner, status and timeline of this project. A free account opens every field.

Source: Data Center Dynamics

Red Post Energy Group has signed a letter of intent with Wise Innovation Hub Venture to develop a natural gas power supply solution for a planned data center and technology hub in Wise County, Virginia. The project is a phased power generation initiative intended to support multiple data center operators near Lonesome Pine Regional Airport, with a capacity of up to 600MW, starting with an initial

Status
Prospective
Sector
Airport, Natural Gas, Power Generation (CCGT), Data Center
Location
Wise County, Virginia, United States of America
Updated
19 Nov 2026
Source
Data Center Dynamics

ConstructChat

Ask ConstructChat about Maverick Project Natural Gas Power Solution

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Maverick Project Natural Gas Power Solution” is an infrastructure initiative in the Airport sector, located in Wise County, Virginia, United States. Taiyo aggregates data on it from Data Center Dynamics.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Red Post Energy Group has signed a letter of intent with Wise Innovation Hub Venture to develop a natural gas power supply solution for a planned data center and technology hub in Wise County, Virginia. The project is a phased power generation initiative intended to support multiple data center operators near Lonesome Pine Regional Airport, with a capacity of up to 600MW, starting with an initial phase of approximately 100MW.

Original sector

Energy

Location

Country

United States of America (USA)

State

Virginia

City

Wise County

Source

Source

Data Center Dynamics

URL

More Details

Record type

Project

Sector

Airport, Natural Gas, Power Generation (CCGT), Data Center

Article published date

2025-12-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project