logo

Maverik #790 Parowan UT

Sector: Metal • Location: Parowan, Utah, United States of America

Source: Dodge

Project
Bid Results

BUILDING SCOPE OF WORK: New Maverik store 5,637 sf. SITE SCOPE OF WORK: The site work development, approx. 9.59 acres, includes earthwork complete underground utility systems, asphalt and landscaping. OFF-SITE SCOPE OF WORK: Improvements along 2200 W, 200 S, and the on and o/ ramp of I-15. SCHEDULE Job Start: End Mar 2025 ~ Job Finish: End Sept 2025 NOTES 1. Please break out ON and OFF site costs

Status
Closed
Sector
Metal, Steel, Road, Automotive, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Residential
Location
Parowan, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Maverik #790 Parowan UT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Maverik 790 Parowan UT” is an infrastructure initiative in the Metal sector, located in Parowan, Utah, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BUILDING SCOPE OF WORK: New Maverik store 5,637 sf. SITE SCOPE OF WORK: The site work development, approx. 9.59 acres, includes earthwork complete underground utility systems, asphalt and landscaping. OFF-SITE SCOPE OF WORK: Improvements along 2200 W, 200 S, and the on and o/ ramp of I-15. SCHEDULE Job Start: End Mar 2025 ~ Job Finish: End Sept 2025 NOTES 1. Please break out ON and OFF site costs on your proposal if applicable.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Parowan

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Steel, Road, Automotive, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Residential

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project