logo

Maximiliano Gaidzinski S.A. - Industria de Azulejos Eliane

Sector: Water Supply and Storage • Location: Brazil

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameBrazil-Eliane     RegionLatin America and the CaribbeanSectorProject No009174Projected Board DateNovember 6, 1998Company NameMaximiliano Gaidzinski S.A. Industria de Azulejos ElianeTechnical Partner and/or Major Shareholders Maximiliano Gaidzinski S/A - Industria De Azulejos Eliane ("Eliane") was established by Maximiliano Gaidzinski in 1962 in Cocal

Project Information FAQ

Project Information

4 Q
The project “Maximiliano Gaidzinski S.A. - Industria de Azulejos Eliane” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameBrazil-Eliane     RegionLatin America and the CaribbeanSectorProject No009174Projected Board DateNovember 6, 1998Company NameMaximiliano Gaidzinski S.A. Industria de Azulejos ElianeTechnical Partner and/or Major Shareholders Maximiliano Gaidzinski S/A - Industria De Azulejos Eliane ("Eliane") was established by Maximiliano Gaidzinski in 1962 in Cocal do Sul in the state of Santa Catarina, Brazil. The Company is presentlty owned and controlled by the founder''s wife, his children and their spouses. However, none of these individuals is directly involved in the management of the Company, which is fully professional.     Project Cost Including proposed IFC investment Total project cost is estimated at US$120 million. IFC is considering a total investment of US$45 million including a loan of US$30 million and an equity subscription of US$15 million, both for its own account.Location of project and Description of site The proposed project will be carried out at Eliane’s existing plants in Cocal do Sul and Criciuma in the state of Santa Catarina and in Salvador in the northeastern state of Bahia. Description of Company and Purpose of Project Eliane is a medium-sized, family-owned company that has become the leading manufacturer of ceramic tiles in Brazil with 1997 net sales of US$194 million. The Company produces ceramic wall and floor tiles and, in 1996, introduced a new porcelain tile (“porcellanato”) technology, the first of its kind in Brazil. Eliane’s major focus has traditionally been on the domestic market, which represents 84% of the Company’s revenues. Exports (mainly to the U.S., Canada, Argentina, Chile, Bolivia and Paraguay) account for the remaining 16% but are expected to increase over the coming years. The proposed project has two elements: modernization and expansion of existing plants (US$40 million) and financial restructuring to reduce the Company''s high level of financial expenses (US$80 million).           Environmental Category and Issues This is a category B project according to IFC''s environmental review procedure. Environmental, occupational health and safety issues associated with this Project include: liquid effluent and air emissions from the kiln, control of employee exposure to heat, dust, noise, and aerosol from pigmentation and glazing operations.  The Company will implement a Corrective Action Plan to upgrade the environmental conditions of its operations and ensure they comply with World Bank guidelines. The CAP includes air emissions controls, installation of wastewater treatment facilities at several plants, follow-up of the existing health and safety programs and adequate handling of solid residues. IFC concludes that, with the implementation of the CAP, the proposed project is being designed to meet Government of Brazil requirements, and World Bank policies, and environmental, health and safety guidelines   The is from the InfoShop.     Date SPI sent to InfoShop      October 2, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data