logo
ProjectOngoing

Maximising tidal energy generation through Blade Scaling & Advanced Digital Engineering

Ongoing · Poland, Netherlands, Spain, Belgium

Source: EU Funding & Tenders Portal

The MAXBlade project will specifically focus on delivering a 70% increase in rotor swept area of the technology by addressing design, reliability, condition monitoring, maintenance and control issues relating to tidal turbine blades. All of these issues have to date been insufficiently addressed for tidal turbine blades and need to be holistically tackled to reach a site-averaged €30/MWh cost red

Status
Under Construction
Sector
Manufacturing (Industrial), Wind
Location
Poland
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Maximising tidal energy generation through Blade Scaling & Advanced Digital Engineering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Maximising tidal energy generation through Blade Scaling & Advanced Digital Engineering” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Poland, Netherlands, Spain, Belgium. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The MAXBlade project will specifically focus on delivering a 70% increase in rotor swept area of the technology by addressing design, reliability, condition monitoring, maintenance and control issues relating to tidal turbine blades. All of these issues have to date been insufficiently addressed for tidal turbine blades and need to be holistically tackled to reach a site-averaged €30/MWh cost reduction in tidal stream energy, while maturing the technology to address barriers around investment attractiveness. The project also anticipates significant challenges and expected legislative requirements around applying circular economy principles to tidal stream turbine blades in pursuit of a net zero generation sector. With a close interface between blade design and testing activities, the project addresses a comprehensive circular economy roadmap for tidal turbine blades, including advancing the potential of recyclable thermoplastic resins for use in the composite blades. The project also progresses initiatives to ensure that the European composite sectors become the international leader in tidal blade manufacture through knowledge transfer, practical engagement in the blade production design and identifying and addressing barriers to increasing European supplier capacity. The project will consist of a 2-year design and development phase, an 18-month build, followed by a 2-year performance verification through the build of a tidal array of at least two units (c. 5MW), ensuring that 8 blades (4 rotors) are tested providing cumulatively 120,000 hours of rotor performance data.

Location

Country

Poland

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Wind

Article published date

2025-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project