Maxwell Locks and Dam Interlock Control System Replacement
Sector: Water Supply and Storage • Location: East Millsboro, Pennsylvania, United States of America
Source: Dodge
The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Telecommunications, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- East Millsboro, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Maxwell Locks and Dam Interlock Control System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | East Millsboro |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Telecommunications, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
