Mayo Lake Road Culvert Replacement
Sector: Water Supply and Storage • Location: Clinton, Ontario, Canada
Source: Dodge USA
Removal and disposal of the existing culvert which carries Mayo Lake Road over the navigable waterway between Mayo Lake and Gin lake, and supply and installation of a new culvert. This includes implementing a road closure, sediment and erosion control, and de-watering as required to complete construction.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial
- Location
- Clinton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mayo Lake Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal and disposal of the existing culvert which carries Mayo Lake Road over the navigable waterway between Mayo Lake and Gin lake, and supply and installation of a new culvert. This includes implementing a road closure, sediment and erosion control, and de-watering as required to complete construction. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
