logo
ProjectCompleted

Mayo River Bridge Refurbishment

Completed · Yukon

Source: Infrastructure Canada

Corrosion Protection to extend the service life of the Mayo River Bridge, which was built in 1957 and crosses the Mayo River at km 51.0 on the Silver Trail Highway, just north of the town of Mayo.

Status
Closed
Sector
Road, Bridge, Government
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Mayo River Bridge Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mayo River Bridge Refurbishment” is an infrastructure initiative in the Road sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Corrosion Protection to extend the service life of the Mayo River Bridge, which was built in 1957 and crosses the Mayo River at km 51.0 on the Silver Trail Highway, just north of the town of Mayo.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project