Mayo Water Treatment Plant Geoexchange System Upgrades
Sector: Water Supply and Storage • Location: Yukon, Canada
Source: Infrastructure Canada
Village of Mayo’s freeze protection for their water storage and distribution includes a geoexchange system that has been in operation for approximately 30 years and is past the end of its service life. The geoexchange system comprises two deep wells and a plate heat exchanger. In the fall of 2020, one of the geoexchange wells failed and the Village has been relying upon one well for freeze protect
- Status
- Under Construction
- Sector
- Water Supply and Storage, Natural Gas, Government
- Location
- Yukon, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Mayo Water Treatment Plant Geoexchange System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Village of Mayo’s freeze protection for their water storage and distribution includes a geoexchange system that has been in operation for approximately 30 years and is past the end of its service life. The geoexchange system comprises two deep wells and a plate heat exchanger. In the fall of 2020, one of the geoexchange wells failed and the Village has been relying upon one well for freeze protection. A temporary backup propane boiler system has been installed in case the remaining well fails; however, the geoexchange system saves the Village around $190,000 in fuel cost each year and displaces fossil fuel consumption. This project includes drilling two replacement geoexchange wells, decommissioning the old wells, piping the new wells into the water treatment plant, replacing the heat exchanger, completing associated electrical and SCADA upgrades, and partial replacement of discharge piping. Government of Yukon retained a consultant, Morrison Hershfield, to complete a conceptual design and cost estimate to inform this funding application. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Yukon |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
