logo

Mayo Water Treatment Plant Geoexchange System Upgrades

Sector: Water Supply and Storage • Location: Yukon, Canada

Source: Infrastructure Canada

Project
In Progress

Village of Mayo’s freeze protection for their water storage and distribution includes a geoexchange system that has been in operation for approximately 30 years and is past the end of its service life. The geoexchange system comprises two deep wells and a plate heat exchanger. In the fall of 2020, one of the geoexchange wells failed and the Village has been relying upon one well for freeze protect

Status
Under Construction
Sector
Water Supply and Storage, Natural Gas, Government
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Mayo Water Treatment Plant Geoexchange System Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mayo Water Treatment Plant Geoexchange System Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Village of Mayo’s freeze protection for their water storage and distribution includes a geoexchange system that has been in operation for approximately 30 years and is past the end of its service life. The geoexchange system comprises two deep wells and a plate heat exchanger. In the fall of 2020, one of the geoexchange wells failed and the Village has been relying upon one well for freeze protection. A temporary backup propane boiler system has been installed in case the remaining well fails; however, the geoexchange system saves the Village around $190,000 in fuel cost each year and displaces fossil fuel consumption. This project includes drilling two replacement geoexchange wells, decommissioning the old wells, piping the new wells into the water treatment plant, replacing the heat exchanger, completing associated electrical and SCADA upgrades, and partial replacement of discharge piping. Government of Yukon retained a consultant, Morrison Hershfield, to complete a conceptual design and cost estimate to inform this funding application.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Natural Gas, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project