logo
ProjectBid Results

Mayrand Bridge Replacement

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

The main items of Work of this Contract include the following: .1 Remove and Dispose of Existing Single Span Bridge .2 Install 3-2400 mm dia. x 22 m CSP Culverts .3 Installation of Rip-Rap .4 Installation of Erosion Protection Measures The Site of the Work of this Contract is located in the R.M. of Good Lake.

Status
Closed
Sector
Bridge, Road, Commercial, Hospital, Hotel
Location
Medicine Hat, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mayrand Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mayrand Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Medicine Hat, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main items of Work of this Contract include the following: .1 Remove and Dispose of Existing Single Span Bridge .2 Install 3-2400 mm dia. x 22 m CSP Culverts .3 Installation of Rip-Rap .4 Installation of Erosion Protection Measures The Site of the Work of this Contract is located in the R.M. of Good Lake.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Medicine Hat

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial, Hospital, Hotel

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project