logo
ProjectClosed

Mazurik Access Sidewalk Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Replace existing asphalt sidewalks (designated in Figure 1) with ADA compatible concrete sidewalks. All sidewalks shall be 4 feet wide, fiber reinforced concrete at 4,000 psi with 6% air entrainment and is to follow ODOT Item #608 (Figure 2). Three culverts will also be replaced as part of this project. All will be replaced in the same locations with black corrugated drainage pipe (12 inside diame

Status
Closed
Sector
Cement, Car parking, Commercial, Road, Automotive, Waste Processing and Treatment
Location
Lakeside Marblehead, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Mazurik Access Sidewalk Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mazurik Access Sidewalk Replacement” is an infrastructure initiative in the Cement sector, located in Lakeside Marblehead, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace existing asphalt sidewalks (designated in Figure 1) with ADA compatible concrete sidewalks. All sidewalks shall be 4 feet wide, fiber reinforced concrete at 4,000 psi with 6% air entrainment and is to follow ODOT Item #608 (Figure 2). Three culverts will also be replaced as part of this project. All will be replaced in the same locations with black corrugated drainage pipe (12 inside diameter) and at the existing slopes. See Figure 3 for current typical setup. New pipe will need to ex...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Lakeside Marblehead

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Car parking, Commercial, Road, Automotive, Waste Processing and Treatment

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project