MB Petroleum - Block 5
Sector: Residential • Location: Oman
Source: International Finance Corporation (IFC)
Mazoon Petrogas SAOC (Mazoon or the Company) is engaged in exploration and production of oil and gas. Mazoon and its 50/50 joint operating partner, Mazoon Petrogas BVI Limited (MPBVI) (an indirect wholly-owned subsidiary of China National Petroleum Corporation), explore and produce crude oil in Block-5 through a joint operating company, Daleel Petroleum LLC (the Operator). The Operator has propo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Mazoon Petrogas SAOC (Mazoon or the Company) is engaged in exploration and production of oil and gas. Mazoon and its 50/50 joint operating partner, Mazoon Petrogas BVI Limited (MPBVI) (an indirect wholly-owned subsidiary of China National Petroleum Corporation), explore and produce crude oil in Block-5 through a joint operating company, Daleel Petroleum LLC (the Operator). The Operator has proposed a US$331 million Development Plan, which Mazoon and MPBVI will jointly fund. The Development Plan proposes to further develop Block-5 and to more than double current crude oil production of 12,000 barrels of oil per day (bopd) by way of waterflood. This proposed project is an expansion of a brown-field investment and consists of financing a small portion of Mazoon’s 50% share (US$165.5 million) of the capital expenditures envisioned under the Development Plan. Block-5 contains the Daleel, Mezoon, Shadi and Bushra fields. The largest and most explored field is the Daleel field, which extends from the north to the south of Block-5. This field is further subdivided into five main zones: A, B, C, D and E. The Development Plan calls for the further development of mainly zones B and C. The major Project components of the Development Plan include: (i) further development of the water-supply wells at Masruq (an area twenty-one kilometers from zone B); (ii) water-supply pipeline from Masruq to the B-Block Station (location in zone B housing many of the major Project components); (iii) water-injection equipment; (iv) associated power generation and distribution facilities for the water-supply and water-injection systems; (v) gathering system for new zone B and C production wells; (vi) gas and water separation facilities at B-Block Station; (vii) produced water treatment facility; and (viii) pumping facilities to route separated crude oil from B-Block Station to the main Daleel Gathering Station. Furthermore, the Development Plan calls for the acquisition and the processing of new 3D seismic and the drilling of over ninety appraisal/producer and fifty-six water-injection wells. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
