logo

Mbarara Masaka transmission line

Sector: Government • Location: Uganda

Source: KFW Bank aus Verantwortung

Project
Active

Uganda's electricity supply is affected by both the low capacity of the national transmission line network and the inadequate regional integration with the electricity grids of neighboring countries. This hinders the development of a regional electricity market, as interstate electricity trading is only possible to a limited extent. Potential for the expansion of renewable energies in the region t

Project Information FAQ

Project Information

5 Q
The project “Mbarara Masaka transmission line” is an infrastructure initiative in the Government sector, located in Uganda. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Uganda's electricity supply is affected by both the low capacity of the national transmission line network and the inadequate regional integration with the electricity grids of neighboring countries. This hinders the development of a regional electricity market, as interstate electricity trading is only possible to a limited extent. Potential for the expansion of renewable energies in the region therefore remains untapped. In order to enable secure and low-loss electricity trading and to efficiently ensure supply in the country, an efficient regional transmission network must be created. The proposed 220 kV transmission line between Mbarara and Masaka is part of the Nile Equatorial Lakes Subsidiary Program (NELSAP), a regional program to build a cross-border electricity network that will, in the medium term, connect the countries of East Africa from Ethiopia in the north to Burundi in the south, thus creating the conditions for regional electricity trading. Under the regional leadership of the Nile Basin Initiative (NBI), the countries bordering the Nile Basin have begun to plan and implement such a regional network at 220 kV level. As part of NELSAP, cross-border lines are being built between member states to improve access to electrical energy in the region and thus contribute to economic development and poverty reduction. The line also improves the supply to western Uganda and is therefore a central component of the expansion plan for Uganda's national high-voltage grid. The target group is primarily private households and businesses in the Mbarara - Masaka region that are connected to the electricity grid and will benefit from an improved electricity supply. In addition, other customers will be connected to the electricity grid through supplementary measures as part of the project (electrification project of the AfD, financed by the EU ITF). The population not connected to the electricity grid also benefits indirectly from the improved electricity supply to central facilities. As part of the NELSAP, consumers throughout East Africa will also benefit from a more reliable electricity supply and lower generation costs as a result of improved interstate electricity trading. The project sponsor is the Ugandan transmission company UETCL. The total cost of the project (excluding the rural electrification component) is estimated at EUR 85 million. Part of the financing (EUR 37 million) will be provided by the AfD through an interest-subsidized loan, and the Ugandan government will provide EUR 13 million. Participation by the German Federal Financial Supervisory Authority with an interest-subsidized loan of up to EUR 35 million is therefore necessary to ensure total financing. The project is to be implemented as co-financing together with the AfD as part of the Mutual Reliance Initiative (MRI).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data