MBL Highway Development Company Limited
Sector: Automotive • Location: India
Source: World Bank Group
On 9th September 2011, Madhya Pradesh Road Development Corporation (MPRDC) signed a 30-year concession (including construction period of 1.5 years) with MBL Infrastructures Limited for the strengthening, improvement, two-laning, operation and maintenance, and tolling of 75.6kms of Seoni to Katangi section of SH-54 start from Ganesh Chowk Km. 1.5 of SH-26 to Km 51.4 (Seoni district) and Km 51.4 or
- Status
- Prospective
- Sector
- Automotive, Bridge, Car parking, Commercial, Raw Materials, Residential, Government, Road, Hotel, Waste Processing and Treatment
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MBL Highway Development Company Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On 9th September 2011, Madhya Pradesh Road Development Corporation (MPRDC) signed a 30-year concession (including construction period of 1.5 years) with MBL Infrastructures Limited for the strengthening, improvement, two-laning, operation and maintenance, and tolling of 75.6kms of Seoni to Katangi section of SH-54 start from Ganesh Chowk Km. 1.5 of SH-26 to Km 51.4 (Seoni district) and Km 51.4 or 0.10 to 24.10 (in Balaghat district) on SH-54 (MP-Maharashtra Border), in the state of Madhya Pradesh. Under the contract, MBL was responsible for the design, construction, finance, operation and maintenance,strengthening and widening the existing carriageway to 2-lane road with granular shoulders. The scope would include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc.The expansion project, part of the MPRDC Highway Development Program, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region.The project road is used for transportation of manganese, coal and other minerals extracted in the nearby mines, items like herbs, teak, sal etc. from nearby forests, and agricultural products amongst others. The road was also used by tourists visiting nearby attractions like Pench National Park or Kanha National Park. MBL Infrastructures Limited established MBL Highway Development Company Limited on 23rd August 2011, a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by MPRDC, by requesting for the lowest upfront subsidy (viablity gap funding) of US$ 11.9mn (INR 595mn @50 INR/USD). Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The project attained financial closure on 21st February 2012. The grant/debt/equity ratio of the project was 25/54/21. The estimated capital cost of the project at the time of financial closure was US$ 48.1mn (INR 2405.9mn @50 INR/USD). Apart from viability gap funding (grant) of INR 595mn (Central Government - INR 305mn, and Govt of Madhya Pradesh - INR 290mn), financing comprised of external commercial borrowing (ECB) loans of US$ 26mn (INR 1300mn @50 INR/USD) and sponsor equity of US$ 10.2mn (INR 510.9mn).The ECB debt was arranged by London branches of Bank of Baroda and Punjab National Bank. The Appointed Date of the project was February 21, 2012. 90 percent of the total land requirement had been handed over to the concessionaire. However, land acquisition for around 13.829 hectares was still pending and the process was underway. It was understood that construction works had commenced at the time of collection of this information and completion was scheduled by February 2014. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Bridge, Car parking, Commercial, Raw Materials, Residential, Government, Road, Hotel, Waste Processing and Treatment |
Article published date | 2024-06-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in India
- Mundra Ultra Mega Power Plant Gujarat
- Dholera Solar Park Gujarat
- ONGC Tripura Power Plant
- Tuppadahalli Wind Farm
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
