MC WWTP Biosolids Processing Facility
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge USA
The work consists of furnishing all materials and equipment and performing all labor necessary for construction of WAS Storage Tanks, a Dewatering Facility, a Thermal Dryer Facility, Filtrate Pump Station and Flow Meter Vault, a Primary Sludge Storage Tank, Solids Odor Control Facility and installation of WAS transfer pumps and WAS Storage blowers, and all associated yard piping, civil, electrical
- Status
- Under Construction
- Sector
- Geothermal, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Rock Hill, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MC WWTP Biosolids Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of furnishing all materials and equipment and performing all labor necessary for construction of WAS Storage Tanks, a Dewatering Facility, a Thermal Dryer Facility, Filtrate Pump Station and Flow Meter Vault, a Primary Sludge Storage Tank, Solids Odor Control Facility and installation of WAS transfer pumps and WAS Storage blowers, and all associated yard piping, civil, electrical, and instrumentation work as detailed in the drawings and specifications for the MANCHESTER CREE... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Rock Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Geothermal, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in United States of America
- SOLAR THERMAL INSTALLATION, EVACUATED SOLAR COLLECTOR TUBES AND 950 LITER BUFFER TANK
- The Music Center at Strathmore
- National Museum of the American Indian
- Waterfront Station
- Wheaton Revitalization Project
- Polk Street Resurfacing & Sidewalk
- Primary and Secondary Calibration on Active Layer (PASCAL)
- Industrial Efficiency and Decarbonization Office (IEDO) FY23 Multi-Topic FOA
