MC WWTP Biosolids Processing Facility
Sector: Water Supply and Storage • Location: Rock Hill, South Carolina, United States of America
Source: Dodge USA
The work consists of furnishing all materials and equipment and performing all labor necessary for construction of WAS Storage Tanks, a Dewatering Facility, a Thermal Dryer Facility, Filtrate Pump Station and Flow Meter Vault, a Primary Sludge Storage Tank, Solids Odor Control Facility and installation of WAS transfer pumps and WAS Storage blowers, and all associated yard piping, civil, electrical
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work consists of furnishing all materials and equipment and performing all labor necessary for construction of WAS Storage Tanks, a Dewatering Facility, a Thermal Dryer Facility, Filtrate Pump Station and Flow Meter Vault, a Primary Sludge Storage Tank, Solids Odor Control Facility and installation of WAS transfer pumps and WAS Storage blowers, and all associated yard piping, civil, electrical, and instrumentation work as detailed in the drawings and specifications for the MANCHESTER CREE... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
