MC23-06 Structure 50-180-134 Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project consists of demolition of an existing structure, installation a 3-cell 10'x8'' cast-in-place box culvert, drainage fabric and riprap installation, approach grading, asphalt surfacing erosion control, and hydroseeding.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Government
- Location
- Renner, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MC23-06 Structure 50-180-134 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of demolition of an existing structure, installation a 3-cell 10'x8'' cast-in-place box culvert, drainage fabric and riprap installation, approach grading, asphalt surfacing erosion control, and hydroseeding. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Renner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
