McCallum Powder Bulk Emulsion Manufacturing & Storage
Sector: Consumer Products • Location: Chehalis, Washington, United States of America
Source: Dodge
The applicant proposes the construction of a bulk emulsion manufacturing and storage facility within an existing +/- 3,200 ft light-industrial shell building located at 123 Habein Road. A Conditional Use Permit (CUP) is required by the City of Chehalis for the project, as it involves the production, use, and storage of hazardous materials.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Construction Documents |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The applicant proposes the construction of a bulk emulsion manufacturing and storage facility within an existing +/- 3,200 ft light-industrial shell building located at 123 Habein Road. A Conditional Use Permit (CUP) is required by the City of Chehalis for the project, as it involves the production, use, and storage of hazardous materials. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
