McCarthy Beach Ski Trail Road Improvement
Sector: Commercial • Location: Side Lake, Minnesota, United States of America
Source: Dodge
The labor, equipment, mobilization, fuel, lubricant, aggregate, materials, tools, transportation, and incidentals necessary to provide, load, haul, spread, level, crown, and compact an estimated 1,100 cubic yards loose measure of class 5 aggregate on an approximately 1.4 mile portion of Ski Trail Road stretching from County Road 5 to the Pickerel Lake parking lot as specified within McCarty Beach
- Status
- Closed
- Sector
- Commercial, Rail, Car parking, Road, Mass Transit, Manufacturing (Industrial), Automotive
- Location
- Side Lake, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about McCarthy Beach Ski Trail Road Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The labor, equipment, mobilization, fuel, lubricant, aggregate, materials, tools, transportation, and incidentals necessary to provide, load, haul, spread, level, crown, and compact an estimated 1,100 cubic yards loose measure of class 5 aggregate on an approximately 1.4 mile portion of Ski Trail Road stretching from County Road 5 to the Pickerel Lake parking lot as specified within McCarty Beach State Park. Work cannot commence before April 01, 2025 or the date the State obtains all required... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Side Lake |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Rail, Car parking, Road, Mass Transit, Manufacturing (Industrial), Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
