McCarthy’s Lane Storm Sewer
Completed · Newfoundland and Labrador
Source: Infrastructure Canada
The project will correct present drainage issues through installation of new curb and gutter, catch basins and storm sewer. The new storm sewer will allow water to flow to a new storm outfall leading to the ocean. Existing water main and water services will be replaced c/w new curb stops. The road will be realigned to address intersection safety issues, then repaved.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about McCarthy’s Lane Storm Sewer
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will correct present drainage issues through installation of new curb and gutter, catch basins and storm sewer. The new storm sewer will allow water to flow to a new storm outfall leading to the ocean. Existing water main and water services will be replaced c/w new curb stops. The road will be realigned to address intersection safety issues, then repaved. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
