McCarty, Madrona, and Willow - Phase IV(a)
Completed · Washington
Source: UW Seatlle
The Housing Master Plan originally envisioned renovations of McMahon, Haggett, McCarty, and Hansee Halls. Consistent with the analysis of Lander and Terry Halls, the original plan to renovate McCarty and Haggett Halls was determined to be more expensive than constructing new buildings to meet the desired program. Seismic, energy code, and infrastructure upgrades, as well as current high-rise code
- Status
- Closed
- Sector
- Commercial, Education, Road, Steel, Government
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- UW Seatlle
ConstructChat
Ask ConstructChat about McCarty, Madrona, and Willow - Phase IV(a)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Housing Master Plan originally envisioned renovations of McMahon, Haggett, McCarty, and Hansee Halls. Consistent with the analysis of Lander and Terry Halls, the original plan to renovate McCarty and Haggett Halls was determined to be more expensive than constructing new buildings to meet the desired program. Seismic, energy code, and infrastructure upgrades, as well as current high-rise code requirements at McCarty and Haggett Hall, demonstrated that new construction would be a more cost-effective option. Hansee Hall will receive minor cosmetic improvements and the decision regarding McMahon Hall will be made after further evaluation of options. The north campus student housing projects is proposed over two phases, Phase IV(a) and IV(b). Phase IV(a) consists of the demolition of McCarty Hall and replacing it with (3) new buildings. Phase IV(b) consists of the demolition of Haggett Hall and replacing it with (2) new buildings as well an upgrade to Denny Field. Phase IV(a) is planned for three new buildings, identified as buildings B, C and D, with occupancy planned for Autumn Quarter 2018. McCarty and Haggett Halls have a design capacity of 620 beds and 800 beds respectively for a total of 1,420 beds. Buildings B, C and D will have capacity for 1,758 beds. With a slight reduction in the number of beds available the total number of beds available in the housing system will be maintained by providing for some triples in the West Campus housing until Phase IV(b) is completed. The demolition of Haggett Hall during Phase IV(b) will allow for the completion of a service road to the east which will serve buildings B, C and D. The demolition at the end of phase IV(a) allows HFS to manage the bed flow capacity by minimizing the change in the number of beds available for students. A new dining facility and catering kitchen are planned for Building D to replace the dining in McMahon Hall and the catering kitchen in Haggett Hall. This new dining facility will support the north campus area. The new catering kitchen in building D will serve the entire campus. Consolidating the dining facility and catering kitchen will provide long-term operating savings and improve the efficiency of the food services operation. The new buildings in the north campus will have a variety of designed room types for 2, 3, and 4 persons. The exact nature of Buildings B, C and D will be determined during the predesign phase. |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source reliability | High |
Source | UW Seatlle |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Road, Steel, Government |
Article published date | 2023-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
