McCaslin Slope Stability Project
Sector: Government • Location: Superior, Colorado, United States of America
Source: Dodge USA
This project will stabilize and restore the bank slope on the east side McCaslin Boulevard between High Plains Drive and the WTP. This bank slope continues to shift and move and not stabilizing this bank jeopardizes the integrity and stability of the roadway surface
- Status
- Failure
- Sector
- Government, Commercial, Manufacturing (Industrial)
- Location
- Superior, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about McCaslin Slope Stability Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will stabilize and restore the bank slope on the east side McCaslin Boulevard between High Plains Drive and the WTP. This bank slope continues to shift and move and not stabilizing this bank jeopardizes the integrity and stability of the roadway surface |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Superior |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
