McColl-O'Donnell Drain Supply and Install
Closed · Ontario · Last reported Jul 2025
Source: Dodge
Scope of Work: Brushing & Tree Removal Removals of Existing Culverts and Catchbasins Supply and Install 825mm dia. Concrete Tile Supply and Install 825mm dia. Concrete Tile (2000D) Supply and Install 3 x Catchbasins Supply and Install 600mm and 900mm HDPE pipe under Uttoexter Road by Open Cut
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government
- Location
- Wyoming, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about McColl-O'Donnell Drain Supply and Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work: Brushing & Tree Removal Removals of Existing Culverts and Catchbasins Supply and Install 825mm dia. Concrete Tile Supply and Install 825mm dia. Concrete Tile (2000D) Supply and Install 3 x Catchbasins Supply and Install 600mm and 900mm HDPE pipe under Uttoexter Road by Open Cut |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Wyoming |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
